Featured Projects
Recent & in progress.
From 120" storm drain and twin box culverts to fully welded steel transmission mains, here's what our crews have been building.





NOW HIRING CONTACT US TODAY!!!!!
From 120" storm drain and twin box culverts to fully welded steel transmission mains, here's what our crews have been building.
Completed 2023Nearly two miles of large-diameter, fully welded CML&C steel water transmission main, one of the largest-diameter pipelines in our portfolio.
Completed 2025A large-scale backbone infrastructure project combining major storm drain, sewer and water systems, including twin box culverts set in deep shoring.
Completed 2025Complete wet utility package for a Prologis development, highlighted by 120" RCP storm drain and a cast-in-place diversion structure.
Completed 2024More than three miles of large-diameter, fully welded CML&C steel water transmission main serving the Ontario Ranch area.
Completed 2026Large-diameter trunk sewer replacement along a major arterial, kept in service throughout construction with large-scale sewer bypass systems.
Completed 2026Large precast box culvert storm drain at Walker Ave. and Eucalyptus Ave., with a network of connecting laterals.
Completing Early 2027Prime contract with JCSD for a major recycled water backbone, delivered through multi-city and multi-agency permitting and tight traffic control.




